Foundation waterproofing at Kulla Tirana Boulevard, with materials supplied and site work supervised by SARP.

System
Mapeproof FBT fully bonded membrane (Mapei)
Work
Foundation waterproofing
Client
Kron Konstruction
Our role
Supply of materials and site supervision

Planning a similar project? Talk to our Head of Projects.

+355 67 202 2609WhatsApp

About the project

Kulla Tirana Boulevard needed its foundations protected against ground moisture and water before the structure went up. SARP supplied the waterproofing system and followed the installation on site together with Kron Konstruction.

Waterproofing below ground is laid before the reinforcement and the concrete. Once the building stands it can no longer be reached or repaired, so the system has to be continuous across the whole footprint, including joints and penetrations.

System applied

Mapeproof FBT, a synthetic fully bonded membrane laminated with non-woven fabric, waterproofed the foundations, with the sheets joined by Mapeproof FBT Tape 600. Idrostop Soft bentonite profiles sealed the construction joints between concrete pours, and Polydren PL geotextile served as a separation and protection layer.

Where water was coming through at the anchors, it was stopped with Lamposilex, a rapid-setting hydraulic binder that blocks seeping water instantly, even under pressure.